UK jobs. Bigger possibilities.

Senior Agent

On-site in the UK·Added 2 months ago

Costain

231 open roles

Overview

Requirements

  • Work on-site in the UK

    No relocation package mentioned.

Requirements

What we're looking for

  • Extensive experience in construction delivery ideally with 3 years+ in a management position (e.g. Agent/Sub-Agent)
  • Knowledge and experience of relevant standards and procedures
  • Experience of working within a Principal Contractor environment
  • Knowledge and experience of Temporary Works procedures
  • Behavioural Management training
  • Understanding of Engineering Principles
  • Knowledge of forms of contract through experience and formal training.
  • Extensive technical knowledge of construction techniques and best practices.
  • Management of temporary works
  • Computer competence (MS Word, Excel, Document control system).

Nice to have

  • Experience of handover processes
  • Highway (SRN) environment construction experience (including planning and delivery of works within traffic management)
  • Experience of earthworks and stabilised pavement construction
  • Planning and management of lifting
  • Temporary Works co-ordinator
  • Lifting AP
  • Professionally qualified or working towards professional qualification

Education & certifications

  • Degree or HND in Civil Engineering or allied subject or equivalent vocational training
  • Relevant CSCS card
  • SMSTS or equivalent H&S qualification

The role

Due to recent success Costain are proud to be recruiting for a Senior Agent. Costain has been appointed to design and construct the West Winch Housing Access Road (WWHAR) for Norfolk County Council (NCC). Reporting directly to the Construction Manager, this role in Stage 1 is to support ECI activities to inform safe and efficient construction including buildability, supply chain engagement and cost forecasts and on site surveys. In Stage 2 you will lead construction operations alongside the Works Superintendent from the start.

What you'll do

  • Put safety above all else and lead by example.
  • Promote a Right First-Time approach to quality and avoid rework.
  • Manage on site survey works
  • Develop buildable solutions with safe and efficient design in mind with the design team and suppliers
  • Provide construction leadership and manage all aspects of construction (for your discipline).
  • Ensure all works are carried out in accordance with The Costain Way.
  • Manage a team of engineering staff and collaborate with other members of the project team.
  • Support the Construction Manager in all construction matters including handover.
  • Provide planning and procurement support, implementing product control and all related subcontract activities.
  • Review contractual agreements, working methods, programme and forecast costs with the Estimator, General Foreman and Subcontractors / Suppliers identifying any inaccuracies or inconsistencies, and feedback any changes made to the QA and QS teams.
  • Prepare and review programmes and forecast budgets, actual programme and productivity achieved and review weekly, taking action where appropriate, as reported by your Agents and Engineers. Where required report/escalate issues to the Construction Manager and QS team.
  • Be fully conversant with subcontractors' contract conditions, develop job specific subcontract conditions and manage the subcontractors account with the QS team
  • Requisition/approve resources in a timely manner to ensure that they are correctly specified and readily available so as not to impede the construction programme.
  • Ensure that any non-conformances and any instructions received from the client / designer / NEC Supervisor staff are communicated to QA and QS teams.
  • Ensure that comprehensive records of resources employed on additional works are maintained.
  • Ensure that full and accurate daily site diary, including any changes / variations, subcontractors' attendance, and records of work-related discussions with client / designer / NEC Supervisor / project team are maintained by your team.
  • Ensure that inspection and test plans, risk assessments and method statements for the control of the works are reviewed, approved, and adhered to.
  • Keep abreast of developments in your professional field.
  • Act as or manage lifting AIP and Temporary works co-ordinator

About Costain

Industry
Construction & Engineering
Founded
1865
Employees
1,000–5,000
Headquarters
London, UK
All open roles at Costain

General Foreperson

Costain4d ago3 locations
Ashford +4
Cumbria
Windermere

Construction Manager

Costain5d ago3 locations
Manchester

Finance Assistant

Costain5d ago
County Durham

Lead Civil Engineer

Costain5d ago
Hybrid in Peterborough

Project Coordinator

Costain5d ago
Suffolk

Section Engineer

Costain5d ago2 locations
Manchester

Senior Agent

Costain5d ago2 locations
Windermere
Hybrid in Manchester
Hybrid in Peterborough

Senior Engineer

Costain5d ago
Gatwick
See all 231 jobs